Bridge Park
This design was the final project for General Design Studio 2. The assignment was to create an intervention that would span across Boulder Creak, connecting two separated sides of CU's east campus.
This design was the final project for General Design Studio 2. The assignment was to create an intervention that would span across Boulder Creak, connecting two separated sides of CU's east campus.